Feeney Brothers is your trusted partner for underground utility construction, site development, and emergency response. With over 500 years of combined experience, we specialize in providing innovative solutions for the safe, reliable, and efficient construction of gas distribution systems, energy infrastructure, and site development. Our focus is always on quality, safety, and efficiency, ensuring every project exceeds expectations.

Hours of training
per field employee

Years of combined
experience

Pieces of equipment

Urban Project in Historic District

ABOUT

Feeney Brothers help National Grid with an ongoing effort to replace aging gas infrastructure in Boston’s historic Back Bay.

SERVICE

Utilities and Site Services

LOCATION

Boston, Columbus Ave at Berkley Street

SCOPE

1,800 feet of polyethylene plastic pipe installed

Urban Project in Historic District

Replacing Aging Cast Iron Gas Mains

ABOUT

Eversource Energy’s aging low-pressure gas mains and services posed a greater leak risk as time went by, necessitating the need for replacement. Concurrently, the Town of Naugatuck was slated to repave over 12,000’ of road, requiring close coordination between Feeney Brothers and the Town of Naugatuck.

SERVICE

Emergency Response Services

LOCATION

Cherry St., Naugatuck, CT

SCOPE

12,000+ feet of cast iron main pipe replaced, 250 residential services replaced

Replacing Aging Cast Iron Gas Mains

Pilot Program

ABOUT

Eversource Energy selected Feeney Brothers as the sole contractor to complete a pilot program in Connecticut for 5,000 feet of gas main replacement and 80 residential service connections.

SERVICE

Utilities and Site Services

LOCATION

Waterbury, CT

SCOPE

5000+ feet of plastic gas main, 80+ relayed residential services

Pilot Program

4 miles of 12” Steel Through Challenging Terrain

ABOUT

12” diameter coated steel pipeline construction required directional bores and workarounds to cross varied and challenging terrain with numerous environmental permit restrictions.

SERVICE

Utilities and Site Services

LOCATION

Global Foundries, Malta, NY

SCOPE

4 miles of new 12” diameter coated steel pipeline, 12 directional bores used to cross varying terrain

4 miles of 12” Steel Through Challenging Terrain

Priority Natural Gas Project Expedited

ABOUT

Liberty Utilities reached out to Feeney Brothers in November to complete a 600 ft cast iron relay project with 6 tie-ins and 15 services across 3 lanes on a main street in the center of busy Nashua, NH – before the end of the year. Feeney Brothers completed this project 10 days ahead of schedule after working 22 hours a day and six days a week with zero safety incidents.

SERVICE

Emergency Response Services

LOCATION

Nashua, NH

SCOPE

600 ft cast iron, 6 tie-ins, 15 services

Priority Natural Gas Project Expedited

Security Clearance Required: Gas Main at Logan International Airport

ABOUT

Construction and installation of natural gas main extension at cargo stations during busy holiday shipping season at bustling Logan international airport.

SERVICE

Gas and Electric Utility Infrastructure

LOCATION

Logan Airport, East Boston, MA

SCOPE

2,000 feet of 12” plastic natural gas main extension, 22 lb. intermediate pressure gas service

Security Clearance Required: Gas Main at Logan International Airport

Complex Surroundings, Complex Project

ABOUT

With a tight deadline and project milestones to meet, the main route of the natural gas pipeline included a culvert crossing, heavily traveled intersections with schools, a playground, and a library. The route traveled underneath a subway rail, alongside a high voltage pipe type cable (PTC) with significant overhead congestion.

SERVICE

University & Municipal Infrastructure Services

LOCATION

Quincy, MA

SCOPE

4,300 feet of 12″ coated steel pipe installed

Complex Surroundings, Complex Project

High-Profile Urban Project

ABOUT

National Grid needed to meet the energy demands of the ongoing TD Garden-North Station expansion and redevelopment.

SERVICE

Utilities and Site Services

LOCATION

TD Garden, Boston, MA

SCOPE

800′ of 12” coated steel gas main installed

High-Profile Urban Project

Tewksbury LNG Dyke Wall Erosion Protection

ABOUT

Feeney Brothers Utility Services was hired to stabilize the outer slope of a dyke wall at a National Grid LNG facility in Tewksbury, MA. Years of heavy rain had eroded the 400-foot-diameter structure’s slope. To restore it, the team regraded the area with a long-reach excavator, installed filter fabric, and carefully placed 6-inch rip rap stone to prevent future erosion and ensure lasting stability.

SERVICE

Energy and Renewable Energy Solutions

LOCATION

Tewksbury, MA

SCOPE

Slope restoration for 400 ft. diameter LNG tank

Tewksbury LNG Dyke Wall Erosion Protection
huddled workers floating Image man standing by heavy equipment and smiling

We provide diversified infrastructure services to leading companies and municipalities in the natural gas, electric, water, and telecommunications industries.

Bostonia seal
city seal
Quincy seal
boston housing authority
crown castle
unitil
hanscom air force base
light tower fiber network
national grid
level 3
WMGLD
HG&E
ever source
Phoenix communications inc
curry college
Columbia gas of Massachusetts
Bostonia seal
city seal
Quincy seal
boston housing authority
crown castle
unitil
hanscom air force base
light tower fiber network
national grid
level 3
WMGLD
HG&E
ever source
Phoenix communications inc
curry college
Columbia gas of Massachusetts